886
Ring 3-ruten
22.5 km
8 road authorities
2024 launch year
C86 Ring 3-ruten
Upcoming routes
Route length
22.5 km
Municipalities and road authorities
Lyngby-Taarbæk, Gladsaxe, Herlev, Rødovre, Glostrup, Brøndby, Vallensbæk, Ishøj
The route runs parralel to the light rail along the Ring 3 motorway by one-way cycle tracks in each side of the road, from the Helsingør motorway in Lyngby to Ishøj Strandvej in Ishøj.
About the route
The route is build in extension of the built of the light rail track. The route thus secure a comfortabel, accesible and secure connection along the light rail and makes it easy to combine the bicycle with public transport at the 24 light rail stations along the route. The route further pass five S-train stations as well as seven existing cycle superhighways. The litght rail opens in 2025.
The route connects
The route connects the areas Lyngby, Buddinge, Gladsaxe, Herlev, Ejby, Glostrup, Brøndbyvester, Vallensbæk og Ishøj.
Transport nodes
The route passes:
- Fortunbyen St. (Light rail station, E-bus)
- Lyngby Centrum St. (S-train, light rail station, S-bus, E-bus)
- Gammelmosevej St. (Light rail station)
- Buddinge St. (S-train, light rail station, S-bus)
- Gladsaxe Rådhus St. (Light rail station, S-bus)
- Gladsaxevej St. (Light rail station, S-bus)
- Gladsaxe Trafikplads St. (Light rail station, S-bus)
- Dynamovej St. (Light rail station)
- Herlev Hospital St. (Light rail station)
- Herlev Bymidte St. (Light rail station, S-bus)
- Herlev St. (S-tog, light rail station)
- Herlev Syd St. (Light rail station)
- Rødovre Nord St. (Light rail station)
- Glostrup Ejby St. (Light rail station)
- Glostrup Nord St. (Light rail station, S-bus)
- Glostrup Hospital – Rigshospitalet St. (Light rail station, S-bus)
- Glostrup St. (Regionaltog, S-tog, light rail station, S-bus)
- Kirkebjerg St. (Light rail station)
- Brøndbyvester St. (Light rail station)
- Delta Park St. (Light rail station)
- Vallensbæk St. (S-tog, light rail station)
- Strandhaven St. (Light rail station)
- Ishøj strand – ARKEN St. (Light rail station)
Facts about the route
Expected launch
The route is expected to be launched in 2024.
Funding
The cycle tracks along the Ring 3 motorway are financed as a part of the built of the light rail.